Thursday, December 9, 2010

Whats Cooking Good Looking?





The kitchen we had for the last couple of months was getting to be unbearable. Check out the before shots. YUCK with a capital Ugh!



With a fresh start. Demolition took a couple of days. The tiles were really hard to get off the wall. and the cork like underlay which protected the original vinyl tiles was a nightmare. We used the power drill mainly with a jackhammer type chisel end to remove it. It was incredibly noisy and we went from the blocks least liked to most hated neighbours. The plumber disconnected the hotwater system and modified the existing tap sockets. Bill the electrician removed the oven. (Which we've recently sold on ebay for a bit of extra pocket money.)


Peg worked through the weekend and I joined in on Monday/Tuesday just passed. We had 3 days to complete the kitchen and on the 4th day, installation of the hotwater system, sink and taps as well as the lights, oven, cooktop and rangehood installation. We were overtime. Rescheduled the electrician. Fit in the plumber in the afternoon instead of the morning. The modified cabinet in the corner was a killer and the benchtop was almost chucked in the bin ready to start again. The masons mitre join (which connects the two pieces of benchtop in the corner) seemed straightforward but was a real bugger to get right. Only one second chance for a recut (which was really a trim) to realign or the whole slab would be history. It worked out in the end but it was one of the hardest tasks of the kitchen building process.



So this is where we're up to. ALMOST finished the most of the cabinetry. Waiting on a few cabinet drawer fronts from IKEA and eventually a splashback and floor will slot in. Handles are in the works and will be attached soon.










No comments:

Post a Comment